The total length of Kao-Ping-Hsi Bridge is 2.6 kilometers, Which was divided into three construction methods, namely cable stayed, free cantilever and advanced shoring. Besides, the foundations of A1 and P1(abutment and pylon of cable stayed bridge), are diaphragm walls, and other foundations are 1.5m ψ concrete piles cast-in-place with full casing. The foundation of pylon sits on gravel and sand layer of river banks. Because it is in shape of box, there are many corners. What has been mentioned before causes collapses of diaphragm walls. This bridge is the first one with diaphragm walls as foundations in Taiwan.This article is divided into sections such as geology, excavation equipment, stabilizing solution, unit division and cutting methods, collapse control, the assembling and placing of reinforced cages, underwater concrete pouring, bottom grouting of diaphragm wall, supersonic test of diaphragm wall, counter measure in inclination and sinking of pavement.