In year 1987, C.S.C. had installed the first set of heat recovery equipment at No. 3 Blast Furnace, employing the so-called separated heat pipe system. With our operational experiences plus other plant data, C.S.C. continued to build more heat recovery systems (HRS) at No.1 and No.3 Blast Furnace (BF), and also revised the old one of No.3 BF into a thermal oil based HRS. In the case of No.1 BF, the annually benefit through energy recovery is about one hundred million NT dollars. In 2006 and 2007, C.S.C. will install independent type heat pipe HRS at No.2 and No.4 BF separately. Through these efforts, we hope to attain the double win result of reducing production cost and improving the environmental quality at the same time.