The CPC Natural Gas Trunk-line System will be completed after the finish of LNG Receiving Terminal Phase III and IPP Phase III projects. This paper describes the current dispatching operation, workflow and its platform based on the completed system mentioned above, and hopefully, to provide enough information for CPC business related people in advance. To face the more complicated natural gas transportation network and the market demand in Taiwan till 2004, it is this paper’s intention to utilize the basic dispatching principle to set up the basic model of dispatching, and then to simplify the calculation mode in order to analyze the different producing and dispatching operation. In this way, the optimal dispatching operation within the safety range and under the most economic way could be found. It will help the producing and dispatching operation of CPC Natural Gas Trunk-line, and reduce cost, further to increase the competitiveness for CPC in the future.