透過您的圖書館登入
IP:18.223.125.219
  • 期刊

Maximization of Production Capacity for a Bake Plant's Processing Line with Due Date Constraint between Each Process

若您是本文的作者,可授權文章由華藝線上圖書館中協助推廣。

並列摘要


This paper examines a scheduling problem with perishable items in a food processing plant. The food processing industry presents unique technical challenges to automation. Products (grocery items) and raw materials of food processing plant drastically drop their quality in proportion to the passage of time. Items with this characteristic are defined as ”Perishable items”. About these items, time factor is extremely important. In general, the production scale of food processing industry is small compared with any other industry such as the automotive industry, the consumer electronics industry, and mining and manufacturing industry. Recently, community structure has brought about a drastic change. In spite of such environment, the food processing industry has to carry out the high-mix low-volume production to meet the customer's demand, the global competition, and the variation in popular taste. Food processing industry traditionally has been less automated than other sectors. However scheduling as science-based approach in food processing industry is complex and difficult, it is worth introducing an effective scheduling system and a research on effective operation. In this paper, we concentrate a bake plant to examine the food's particular characteristic in food processing line. And more, in order to operate a more efficient production scheduling for bread processing line in a bake plant, we consider a scheduling problem with perishable items for a bake plant, it is as a typical example of food processing industry. By removing the opportunity loss and the useless factors at the production process thoroughly, the production method is described.

參考文獻


Claassen, G. D. H.,van Beek, P.(1993).Planning and scheduling packaging lines in food industry.European Journal of Operational Research.70(2),150-158.
Honda, N.,T. Tanino(eds.),T. Tanaka(eds.),M. Inuiguchi(eds.)(2002).Advances in Soft Computing: Multi-Objective Program-ming and Goal-Programiming.Springer:
Gargouri, E.,Hammadi, S.,Borne, P.(2002).A study of scheduling problem in agro-food manufacturing systems.Mathematics and Computers in Simulation.60(3-5),277-291.
Ishii, H.,Tada, M.(2000).Approximation algorithms for scheduling problems.IEICE Transactions on Information and Systems.E83-D,496-502.
Jakeman, C. M.(1994).Scheduling needs of the food processing industry.Food Research International.27(2),117-120.

被引用紀錄


Chen, D. C. (2011). 鎳鐵圖形化微結構中自旋傳輸及磁化翻轉行為之研究 [doctoral dissertation, National Chiao Tung University]. Airiti Library. https://doi.org/10.6842/NCTU.2011.00712
陳灝(2018)。新型高量子產率紅-近紅外光螢光分子之合成、鑑定與應用〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU201800405
程健彰(2013)。新型雙光子吸收分子的合成、性質與應用〔博士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2013.00027
Chen, J. B. (2008). 突波式流量之網頁伺服器負載平衡架構的研究 [doctoral dissertation, Tatung University]. Airiti Library. https://www.airitilibrary.com/Article/Detail?DocID=U0081-0607200917243901
許世文(2013)。利用九環內醯胺合環反應合成(±)-Quebrachamine〔碩士論文,國立中央大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0031-0605201417532234

延伸閱讀