摘要


By adding improvements to the pulling mechanism, connectors and mounting plates, the new transformer fault simulation device can simulate transformer winding deformation faults and ensure the efficiency of winding deformation fault generation, disappearance as well as aggravation. To avoid the tediousness of replacing the fault model during fault simulation, the utility of this transformer fault simulation device is further improved by replacing the windings with different number of turns and choosing to manually lift the U-shaped lifting plate or choosing to electrically lift the U-shaped lifting plate according to the use requirements of the simulator.

參考文獻


Peng Dan. Design and Process Research of Insulation Breakdown Test Bench [D]. North China Institute of Aerospace Technology.
Yang Hongtao. Lightning protection of substation transformers [J]. China Information Technology, 2013.
Li Daiqi. Transformer operating characteristics analysis[J]. China Science and Technology Expo, 2011(20):1.
Han Zhenmei. On the application of virtual reality technology in television production [J]. The application of virtual reality technology in television production[J].
Shi Yuhang. An introduction to the development status and application of virtual reality [J]. Chinese information, 2019, 000(001):20.