建築工程專案風險評估模式之研究

The Development of Project Risk Assessment Model for Building Constructions

指導教授 : 曾惠斌

摘要


建築工程專案中所面臨之專案時程、施工條件的不確定性尤甚於其他產業,故應該投注更多心力於工程風險的積極掌握及控制,但國內營造廠商對風險管理技術的認知很低,大多數對於風險仍採取不予理會及亡羊補牢之心態,若能事前將各項風險分析評估並提前準備,則可將其衝擊減至最小。 有鑑於此,本研究將整理出之風險管理相關文獻及程序為基礎,建構出一套建築工程風險評估模式,以執行風險辨識及分類、風險定性及定量分析,評估風險之影響程度,以提供建築工程專案組織執行風險管理參考。本研究透過文獻回顧及問卷調查整理出風險事件、觸發原因、引發後果及處置步驟等,接著經由專家訪談、層級分析法等作為輔助工具,建置一套評估模式,最後結合風險量化模式,完成連貫、系統化的風險評估方法。並與案例廠商現行之實際專案配合,藉由個案導入方式及深入專家學者訪談分析模式在實務操作上之可行性。 本研究結合施工經驗與風險管理理論,提出一套實用的建築工程風險評估模式來提供專案依循操作:專案管理者可利用此模式追蹤掌控風險之狀況;公司內部之高層主管雖未直接參與專案之執行,亦可經由本量化模式計算出之專案風險指數(PRI)分佈情形了解各工地執行之狀況,確實掌控各專案目前所遇到之危險程度及其執行風險管理之成效。

並列摘要


The uncertainty about project schedules and constructional constraints are particularly high in building projects than those of other industries; as a result, more efforts should be made on active monitering and control of construction risks. However, domestic constructors are scarcely conscious of risk management techniques; most are still taking negligent or plainly remedial attitudes towards risks.If assessments and analyses of risks could be made in advance; timely preparations would be possible for reducing corresponding impacts to minimum. Inasmuch, this research will base on collective records of risk management and relative cases, establish a risk assessment model of building construction for execution of risk recognition and catergorization, as well as qualitative and quantitation analyses, to provide building construction project organization with references. This research has collected risk events, triggers, consequences, handling steps, etc.; then constructed an assessment model assisted with experts interview and analytic hierarchy process; finally combined with the risk quantitative model, to accomplish a coherent systematic methodology of risk assessment. Also, this project has cooperated with Ruentex Group, verifying the viability of individual-case analysis and in-depth experts’s interview on practical operations. Through combining constructional experiences with theories of risk management, this research propose a practical constructional risk assessment model for project operations to follow: project managers could apply this model to trace and supervise risk conditions; top managers within could also, although not directly participating in the project execution, realize conditions of constructions sites through the distribution of Project Risk Index calculated by the quantitative model, hence authentically monitor risk degrees of each project and its risk management outcome.

參考文獻


29.賴逢昇,「公路工程進度延誤之風險分析」,高應大土木所,民國94年
1.B. Mulholland and J. Christian,“Risk Assessment in Construction Schedules ”, Journal of Construction Engineering and Management, Vol. 125, No. 1,p8-15 (1999)
2.Daud Nasir; Brenda McCabe and Loesie Hartono,“Evaluating Risk in Construction–Schedule Model .ERIC–S:Construction Schedule Risk Model” Journal of Construction Engineering and Management, Vol.129, No. 5,p518-527 (2003)
3.Faisal Manzoor Arain ;Low Sui Pheng,“Knowledge-based decision support system for management of variation orders for institutional building projects” Automation in Construction 15 (2006)
4.J. H. M. Tah and V. Carr,” Knowledge-Based Approach to Construction Project Risk Management”, Journal of Computing in Civil Engineering, Vol. 15, No.3, p170-177 (2003)

被引用紀錄


李宜育(2014)。台灣工程顧問業統包專案風險管理與經營策略之研究─以T公司為例〔碩士論文,淡江大學〕。華藝線上圖書館。https://doi.org/10.6846/TKU.2014.00504
黃博炫(2011)。淹水災害風險因子分析方法之研究-以蘭陽溪為例〔碩士論文,國立臺北科技大學〕。華藝線上圖書館。https://doi.org/10.6841/NTUT.2011.00317
謝智文(2009)。促參計畫履約管理要項之研究-以觀光遊憩設施類ROT模式為例〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2009.10495
劉祐帆(2009)。公共工程專案風險管理系統之研究-以捷運工程為例〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2009.01570
林紀萱(2009)。施工風險管理機制之研究─以捷運工程施工專案為例〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2009.00864

延伸閱讀