透過您的圖書館登入
IP:18.225.31.159
  • 學位論文

防災公園規劃與運作探討-以屏東市千禧公園為例

Investigation of Disaster Prevention Park Planning and Operation – A Case Study of Millennium Park, Pingtung City

指導教授 : 葉一隆

摘要


災害發生具有高度不確定性,地震災害更是無法準確預測。當巨型地震災害發生時,空曠地區之臨短期的居民收容安置地點需適度規劃,尤其於人口密集之都會區更是需要。本文以屏東市千禧公園作為防災公園規劃地點,利用環境調查與功能需求進行空間配置,並整合週邊資源規劃防災公園運作方式。由規劃結果顯示本防災公園除提供居民臨短期收容外,更可提供政府臨時行政地點,以提供災時對居民之服務。

並列摘要


Disasters occur with high uncertainty, especially earthquake disaster because the earthquake can’t accurately predict. When the huge scale earthquake occurs, the open areas for temporary or short-time to resettle residents is necessary, especially in densely populated metropolitan areas. In this paper, the Millennium Park located in Pingtung City was planned as a disaster-prevention park by environment investigation and functional requirements. In addition, the disaster-prevention park operation is integrated the peripheral resources. The planning results show that the disaster-prevention park not only provides temporary or short-time resettlement but also provides temporary government administration site for disaster resident services.

參考文獻


13.洪志忠,2009,都市化地區地震災後緊急避難據點規劃之研究-以板橋市華江公園為例,國立臺北科技大學建築與都市設計研究所碩士論文,176頁。
27.許銘顯、郭詩毅、林慶元,2004,921大地震時中長期避難所與避難圈關係之調查研究,建築學報,第49 期,中華民國建築學會。
16.李威儀、錢學陶、李咸亨,1997,台北市都市計畫防災系統之規劃,中華民國都市計劃學會。
22.陳緯萍,2005,台北市防災公園規劃與設計之研究-以大安森林公園為例,國立台北科技大學建築與都市設計研究所碩士論文,201頁。
1.潘國雄,2001,大規模地震災害時防災公園評估基準之研究,中央警察大學消防科學系碩士論文,第1頁。

延伸閱讀