重劃統包工程關鍵課題探討

The Study of the Key Issues for Urban Land Readjustment Turnkey Contract

指導教授 : 林震岩
若您是本文的作者,可授權文章由華藝線上圖書館中協助推廣。

摘要


研究以土地重劃統包工程為研究對象,經由執行完成案例分析檢,對於重劃統包工程關鍵課題探討支確認有所幫助,同時藉由關鍵課題經由分類提供解決對策方法,將各級政府發包前所必須具備條件,提供有用資訊作為行政機關參考。 機關於執行發包前相關前置作業未盡完善即進行後續行正招標作業,造成後續施工進場產生相關界面問題不能釐清,衍生工進延遲效率降低而必須工期延長發生爭議,整體設計方面無法統一考量,整體施工因前者不完全致使工作受阻,天候因素展延因屬大面積開發納入工期計算須更客觀評估認定,否則完工時間無法掌握。 透過本論文分析關鍵課題解決方法有五。專案管理與合約管理、委託專業顧問公司、契約條款持平擬定、天候與不可抗力因素工期展延、機關協調關聯廠商義務,行政機關發包前應辦事項內容明確及完成時間,是在執行重劃統包工程重要關鍵課題另一要素。

關鍵字

重劃統包工程

並列摘要


In this study, the Urban Land Readjustment turnkey project for the study, analysis of case review by the Executive completed, the redrawing of turnkey engineering branch confirmed the key topics to explore some help, but the key problem by providing a method Solutions via classification, the various levels The Government must have the conditions before contracting to provide useful information as an administrative organ reference. The Government must have the conditions before contracting to provide useful reference as an administrative organ. organ execution before the relevant pre-contract job that is not entirely complete line of inviting tenders for subsequent operations "caused by the subsequent construction of the approach can not produce the relevant interface issues to clarify the derivative work into delay efficiency is reduced but must extend the duration dispute can not be unified overall design considerations, the overall construction work because the former does not exactly cause disruption due to weather factors spreader is a large area of development into a more objective assessment period shall be calculated otherwise determined completion time. There are five key issues through the analysis of this paper solutions. Project management and contract management, commissioned professional consultants, contractual terms drawn flat, weather and force majeure extension period, should do before authorities coordinate the association vendor obligations, the executive contract matters expressly and completion time, in the implementation of redrawing turnkey another important element of the project a key issue.

參考文獻


6. 碩士論文 簡文欽,2010,重大公共工程統包專案關鍵成功因子之研究,國立交通大學工學院工程技術與管理學程
10. 碩士論文 裴宏芸,2015,從美國採購制度探討國內統包工程執行之關鍵課題,國立交通大學土木工程研究所
9. 碩士論文 吳昌駿,2015,市地重劃工程規劃與執行如何之探討-以桃園經國市地重劃工程為例,國立中央大學土木工程學系研究所
18. 報告January, 2001,DBIA, Design-Build Single Sourcebook,.
21. 期刊Vol.12, No.3, pp.30-34, May 1995.Potter, K. J., and Sanvido, V. E. “Implementing of a Design/Build prequalification system”, Journal of Management in Engineering,

延伸閱讀