In accordance with the economical development plan of R.O.C. Government and the daily increase of LNG requirements an injection/production well project was set up by TPED, Chinese Petroleum Corp., in 1995. There are 6 cluster wells having been drilled and completed in middle 1999. One is vertical and others directional. For maximum quantity in operation of Injection and Produce rate, the daily rate was set at 0.8 millions subsurface gas miaration was considered as the first target to ain at. The quality of casing & cement operation was strictly requested compare to other gas well requirements. This report is a compendium of the entire engineering procedure of each well. Hopefully it would be a drilling classic worthy for future worker's reference.