透過您的圖書館登入
IP:13.58.121.131
若您是本文的作者,可授權文章由華藝線上圖書館中協助推廣。

並列摘要


In this study we look at infrastructure tender projects. Financial data for cost estimates are collected front 42 infrastructure tender projects (including 20 MRT construction tender projects. 14 highway construction tender projects. and 8 public building tender projects). The Takagi-Sugeno's fuzzy theory is first applied to build an s-curve regression model for big projects. After the model is fitted, the cash-to-cash cycle concept is applied to analyze and diagram cash flow estimations for the execution stage of contracted projects. The goal is to understand short-term Financial demands that occur during the execution stage. which leads to a better understanding of cash flow problems. Then, by revising the Miller-Orr cash flow model, a flexible target cash balance model with dual control limits is developed. The analysis of the model application is simple. All the calculations can be done with a trial balance software package such as Excel. In practice, contractors can use s-curve models to preview the cash distribution and amount demanded before projects are executed. Once construction is under way, data from the actual project cash flow can be used to update and revise the predictions. Preparation for dispatching of funds will be made according to cash predictions from the models.

被引用紀錄


張凱琪(2016)。B型肝炎X基因對於兒童B型肝炎感染自然病史所扮演的角色〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU201610118
Chen, T. L. (2012). 行動代理人之私鑰管理機制 [doctoral dissertation, National Taiwan University]. Airiti Library. https://doi.org/10.6342/NTU.2012.02558
Yang, S. C. (2011). 利用氧化鋅奈米柱發光二極體發展腫瘤偵測技術 [master's thesis, National Taiwan University]. Airiti Library. https://doi.org/10.6342/NTU.2011.00260
江承庭(2015)。氮化鋁鎵/氮化鎵高電子遷移率場效電晶體之表面氮化鋁氧化研究〔碩士論文,國立中央大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0031-0412201512084253

延伸閱讀