摘要


研究發展是國家經濟發展與社會進步的原動力,政府與企業每年都投入相當多的人力與心力在這方面。然而研究發展活動是一項屬於長時程、漸進性且不確定性高的工作,對於如何做好績效評估的工作亦極為不容易。但不論是政府與企業組織所追求的即是「績效」的提升,這也是組織管理者所共同努力的目標。因此,如何透過建立一套有效的績效評估管理制度,來掌控研究發展方面的績效,並維持整個組織的生產力是非常重要的一個課題。 目前在台灣的各項的科技研究發展計畫中,電力科技主導全國能源供給,對於企業界或是民生皆影響甚鉅。有鑑於此,本研究乃以個案研究的方式,首先對某電力公司現行的研發計畫評估作業進行探討,主要是以系統化的方式找出現行制度的缺失,然後再透過國內外有關計畫績效評估之相關文獻的整理與分析。最後,我們提出利用豐田及時生產方式(Just-In-Time; JIT)的觀念與作法,嘗試建立一套適用於研發計畫的績效管理制度,其主要著眼點乃為JIT制度所強調之特性 ―消除浪費與維持高品質。在本文中,我們除了對研發計畫的績效管理制度提出系統架構之外,同時也對於制度的細部設計進行詳細的規劃。

並列摘要


In order to have a high economic and social development, both public and private sectors need to continuously allocate resources on basic and applied research. However, as we know, the performance of R&D is hard to evaluate, because its impact often takes a long time. Instead of measuring the results of R&D directly as indicated in the past literature, we tried to use the concepts and the tools of Just-In-Time (JIT) to design a R&D project management system. In this study, we not only propose a framework but also have a system design of R&D project management by using the concepts of pull and seamless system of JIT. Particularly, we use many tools of JIT in the stage of system design, such as, the free-quality-inspection, color management, 5S management, etc. In order to make sure the feasibility of the proposed system, we conduct a case study by using the project management of the R&D institute of an electricity power plant. The results reveal that less paper work and less time are needed. We have a further discussion in the following regarding to the results of this case study.

參考文獻


[4] H. Kerzner, Ph.D., Project Management : A Systems Approach to Planning, Scheduling and Controlling, Van Nostrand Reinhold, New York, 3 rd ed.. (1989)
[5] Jack McKillip, “Need Analysis: Tools for the Human Services and Education ”, Sage Publications. ( 1987 )
[6] John E. Oliver, “Performance Appraisal that Fit”, Personnel Journal, June, P.66 (1985)
[8] Leslie K.Duclos, Samia M. Siha;& Rhonda R. Lummus, “JIT in service : a review of current practices and future directions for research” ,International Journal of Service Industry Management ,Vol. 6,No 5,pp. 36-52. ( 1995 )
[9] Schonberger, R.J. and J.P. Gilbert, “Just In Time purchasing challenge for US Industry”, California Management Review, Vol. 26, No. 1, pp. 54-68(1983)