以標準工時為基礎之排程資訊系統

Production Scheduling System using Standard Time as basic

指導教授 : 何正斌

摘要


本研究主要目的是希望解決業界交貨期不準的問題,其方法是開發一套以標準工時為基礎的排程資訊系統。當接獲產品訂單時,系統透過現場所有訂單的標準工時進行初步排程,並外加合適的寬放,可迅速得到產品的交貨期。而生產現場需回饋所有訂單的實際開工與完工時間,當系統接獲實際開工與完工時間後即進行重新排程,若有延遲,可及早得知並做有效處理。最後透過模擬驗證可知準確的標準工時、即時的現場資訊回報及合適的寬放時間,是產品及時達交的基礎。

並列摘要


The major purpose of the study is try to solve the problem of manufacturer cannot delivery their products on time. A computer scheduling system based on standard time is developed in the study. The scheduling system can obtain delivery time rapidly of a new order according to standard time of all orders plus a suitable allowance. The production scene needs to feedback the starting time and finish time of all orders in order to re-scheduling all orders. Where there is a delay, there is a quick response from the system. Finally, a simulation validate that a fit standard time, a good production feedback system and an appropriate allowance are the basis for the products can achieve the goal of on time delivery.

參考文獻


6. 黃邦賢,多站連續生產型態之標準工時量測-以SMT製程為例,屏東科技大學工業管理系,碩士論文,2008年。
1. Becker, S. A., and Mottay, F. E., “A global perspective on web site usability,” IEEE SOFTWARE, 2001, Vol. 18, No. 1, pp. 54-61.
3. Elkerton, J., “Online Adiding for Human-Computer Interface,” Handbook of Human-Computer Interaction, 1988, pp. 345-364.
5. Miller, G. A., “The magic number seven plus or minus two: some limits of our capacity for information processing,” Psychological Review, 1956, Vol. 63, No. 2, pp. 81-87.
6. Norman, D. A., “The design of everyday things”, Doubleday, 1988, New York.

被引用紀錄


翁煒棋(2012)。以標準工時公式為基礎之排程資訊系統〔碩士論文,國立屏東科技大學〕。華藝線上圖書館。https://doi.org/10.6346/NPUST.2012.00098
陳龍祥(2012)。生產提醒資訊系統-以鋼捲生產為例〔碩士論文,國立屏東科技大學〕。華藝線上圖書館。https://doi.org/10.6346/NPUST.2012.00073

延伸閱讀