現行水土保持計畫之施工檢查制度已行之有年,且眾所周知。在過去時日之運作之下,在實務經驗面上產生若干頗堪玩味與討論釐清之課題。若能將此類課題充分交換意見並討論釐清,將有助於開發業主、執業技師、營造廠商與主管機關之間的明確權責劃分,讓彼此工作順暢易行,又有助於施工品質之提昇,以俾更有利於達成坡地保育合理利用之目標。本文嘗試以水土保持施工之前、中、後三個階段,分別檢視現況制度下於實務上所產生之問題,並盡可能提出解決之方向,以利研究者參考。

並列摘要


The present construction check system for soil and water conservation plain has been adapted for years, and should be verified to meet practical needs. The discussion about invadent the impleasuretation construction check system to clear up the responsibility among the client, practical engineer, constructor and the government, might probe, the evaluation the construction quality to achieve the goal of the soil and water conservation plain. This paper exam the problem occurred in preconstruction on-constructing, after-construction period, respective. As a result, provide some concrete direction to verify the problems.