半導體測試外包決策與外包作業探討-以W公司為例

Outsourcing Decisions in Semiconductor Testing: The Case Study of W Company

指導教授 : 蘇哲平
若您是本文的作者,可授權文章由華藝線上圖書館中協助推廣。

摘要


摘要 外包不是一個新名詞,W公司是一家Iintegrated Device Manufacturer (IDM),該公司長期以追求技術開發能力的掌握、產品驗證時效、以高產能利用率的策略來達到降低生產成本的目的,但在美國金融風暴橫掃全球的衝擊下有了轉變,企業為了求生存,減少現金淨流出,於是工廠停工、關廠、無薪假、裁員等動作紛紛出籠,國內IC產業平均的產能利用率也大幅減少一半左右。本文將探討一個IDM記憶體公司,在金融風暴的壓力下結束測試工廠,將原有內製FT設備產能全數出售,由自製轉為外包的轉變。案例公司決定將FT測試生產作業外包予專業測試廠,其外包的策略對案例公司的影響如何?其決策依據是什麼? 外包決策是否正確是本研究的重點。 本文以案例公司2008年10月作成FT外包決策開始,收集相關資料至2010年4止,以成本模型概念為出發點,分析比較Circuit Probing (CP)及Final Test (FT)的成本表現,並以Flash FT為例,探討外包決策的假設,從CP及FT的成本表現我們發現,FT的生產成本會是CP的1.6倍,CP與FT的產能利用率分別在35%及46.3%以上時維持內製比較有利,所以CP與FT的內製或外製決策假設不一定正確,皆需視產能利用率而定。但檢視案例公司CP與FT產能利用率發現,CP設備使用率維持比FT穩定。另外以實際參與產能移轉專案與駐廠探討分析案例公司的轉變,發現案例公司的客戶對中國供應商是有疑慮的,也因此改變了案例公司的外包產能配置,將較多的產能配置給台灣供應商。實際生產中亦發現,中國供應商的品質問題層出不窮,問題來自於作業人力的不穩定,生產效率差,即使簽約也無法確保產能無虞。另外cycle time亦超出內製甚多,是目前案例公司急迫需解決的問題。最後以案例公司營運的角度回顧『外包』對案例公司的影響,雖然案例公司許多有關外包決策的假設都是錯誤的,但是外包決策卻意外的使該公司有機會迅速的聯合台灣供應商擴大產能,使案例公司適時抓住景氣反轉的契機,營收表現大幅成長。 關鍵詞:外包、IDM、成本模型、CP、FT、Cycle Time

關鍵字

外包 成本模型

並列摘要


Abstract Because the impact of the financial crisis, company W, an Integrated Devise Manufacturer (IDM) who used to reduce production cost by cutting edge research and development, timely product verification, high capacity utilization has to consider to change its strategy and sell the testing plant and outsourcing the FT operations to reduce the net cash flow out. In this study, we exam the decision making process, the assumptions and the impact of W company’s outsourcing decisions. In this study, We collect related data from 2008 Oct. to 2010 Apr. Based on the cost model developed by this study, we find that the cost of Final Test (FT) is 1.6 times of that of Circuit Probing (CP). To perform in house is cheaper than outsourcing when CP and FT capacity utilization at 35% and 46.3% above. Hence, the CP in house and FT outsourcing assumption that it is not absolutely correct. It should depend on capacity utilization. Furthermore, we also find that the customers of W company have doubt about W company’s supplier in China. Those suppliers have serious quality issues caused by high turn over rate and low production efficiency. For these reasons, company W still can not secure enough capacity from Chinese suppliers even though contracts has been sign by both parties. Therefore, W company has to request more capacity from suppliers in Taiwan. In addition, Long cycle time is also another serious problem. Although many of the assumptions of outsourcing decisions turn out to be incorrect, the outsourcing decision surprisingly gives the company the ability to corporate with Taiwanese suppliers and gain the flexibility to expands its capacity. Consequently, when the demand is rebounded, W company dramatically increases its revenue. Keywords: Outsourcing、IDM、Cost model、CP、FT、Cycle Time

並列關鍵字

Outsourcing IDM Cost model CP FT Cycle Time

參考文獻


2.Rajan Varadarajan Department of Marketing,Think more
Business Reports;Aug 1994;19,8;ABI/INFORM Global pg.9
means local problems; Human Resource Management
International Digest;2005;13;3;ABI/INFORM Global pg.6
Outsourcing to gain a competitive advantage; Industrial

被引用紀錄


黃凱亭(2014)。自建產能或委外:晶圓代工廠建立測試產能的抉擇〔碩士論文,國立清華大學〕。華藝線上圖書館。https://doi.org/10.6843/NTHU.2014.00466
曹益生(2012)。台灣記憶體整合元件製造商(IDM)封裝測試外包策略探討〔碩士論文,國立清華大學〕。華藝線上圖書館。https://doi.org/10.6843/NTHU.2012.00641
姜泰全(2016)。半導體製程的品質控管策略探討–以O公司為例〔碩士論文,國立清華大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0016-0411201614430124

延伸閱讀