公共營建工程契約中遲延完工之問題研究--以不可歸責於承攬人為中心

Delayed Completion in Public Construction Contract with No Imputation to the Contractor

指導教授 : 陳聰富

摘要


由於工程履行過程當中常存有許多不確定性以及難以預測之因素,遲延完工問題成為我國工程爭議當中比例最高之類型之一;然而,關於遲延索賠問題應如何解決卻仍未形成一定之法律原則,導致實務上爭議迭生。其中又以不可歸責於承攬人之遲延索賠爭議最為嚴重,本文因此以此作為研究中心。 在研究方法方面,本文除了針對國內實務及學說見解加以分析之外,亦對於外國法之規範情形有所著眼,具體包含其法律規定、以及常被使用之定型化契約範本如FIDIC、JCT、AIA、以及德國的VOB/B條款等。 本文經觀察後發現,遲延完工相關爭議之根源通常在於契約條款文義之不明確、或條款所定之內容不公平,而民法又缺乏直接、明確之補充規範,而導致規範不當或不足之問題發生。此因而形成承攬人於索賠過程當中的兩項主要困難。 因此,本文主要之行文目的即在於探討我國公共工程契約中例如業主單方決定展延日數條款、索賠棄權條款等與索賠相關條款之解釋及有效性;而此事實上即相當於工程契約中風險分配之問題。然而縱使將此類不公平之風險分配條款認定為無效,承攬人應依據何項規定作為其權利主張之依據仍非無疑。針對此點,本文則嘗試透過將遲延事由類型化之方式,提出更具體之實定法基礎以改善情事變更原則、誠信原則等不確定法律概念被過度濫用之狀況。最後,本文並嘗試綜合以上說明,提出一些修正上之建議,希冀我國公共工程契約法制能朝向一個更健全的方向前進。

並列摘要


Due to the uncertainty, unpredictable factors during the performance of the construction, delay in completion are one of the most common types of construction disputes; however, the legal principles relating to delay claims have not been well developed yet. Among all the disputes, the situation to which the contractor is not imputed is the most controversial. This thesis, accordingly, focuses on such cases. As for the research method, except the analysis based on the domestic legel cases and the opinions of the scholars, this thesis also attempts to conduct a detail analysis on the foreign construction law, including their legislation and some of the acceptable standard contracts like FIDIC, JCT, AIA, as well as VOB/B. There are two key characters of the public construction contract law in Taiwan which result in most issues relating to delayed completion. The first one is that the terms or the conditions set in a standard contract are often unclear or unfair; the second is that the governing laws like Civil Code are implicit or ambiguous in such events. To response to the above-mentioned problems, the discussion over the interpretation and the validity of the provisions which substantially involves in the risk allocation in construction project is necessary. Suppose that the provisions relating to the unfair risk allocation are void, the acceptable petitions of fair and reasonable, good faith, or change of circumstances may be referred to; however, these uncertain legal terms could result in the consequence of the violation the legal certainty rule. For this sake, this thesis intends to structure a scheme of the delay claims by categorizing the delay-causative factors to concrete the law application. At last, some revision proposals will be submitted with an aim of achieving a sound legal order for public construction contract.

參考文獻


詹森林,消費者保護法之定型化契約最新實務發展,月旦法學雜誌第91期,2002年。
詹森林,私法自治原則之理論與實務—台灣法制發展之情形,收錄於「民事法理與判決研究」,自版,1998年。
曾品傑,論附合契約—最高法院九十二年度台上字第九六三號判決評釋,東海大學法學研究第23期,2005年。
余文恭,從債務不履行要件之再檢討論兩岸工程施工契約展延工期之比較研究—兼論之相關規定,營建科技與資訊論壇第1期,2007年。
葉錦鴻,「承攬」,三民書局,2007年。

被引用紀錄


吳東鵬(2012)。公共工程總價承攬契約履約爭議問題之研究〔碩士論文,國立臺北科技大學〕。華藝線上圖書館。https://doi.org/10.6841/NTUT.2012.00310
汪家合(2017)。政府採購契約之契約解釋原則-以同等品價差扣除規定為中心〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU201702279
林敬展(2015)。公共工程契約變更之彈性與限制分析〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2015.10890
林祖晞(2015)。論定作人之協力義務〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2015.02805
陶奕亘(2015)。公共工程進度遲延爭議之原因探討及因應策略之研究〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2015.01424

延伸閱讀